The work in this sector
An efficiency measure is decided on the numbers: how much is consumed today, where, with what profile, and how much is really saved afterwards. Without a measurement before and a check afterwards, the saving remains an estimate by the supplier.
The studio has managed energy efficiency and lighting upgrade projects, from the technical to the economic side: survey, design, comparison of solutions, investment analysis and monitoring of the results.
What we do
Reference standards
Before designing, the regulatory scope is defined: which standards apply, in which version and with which customer requirements.
The energy audits that are mandatory for large and energy-intensive companies (Italian Legislative Decree 102/2014) must be carried out by certified professionals, such as energy management experts: the studio prepares surveys, measurements and technical analyses and works alongside them, without replacing them.
How we work
- SurveySite visit, consumption data, operating hours, existing equipment and visual tasks.
- MeasurementMeasurement campaign where data are missing, to build the baseline.
- DesignTechnical solutions compared, lighting calculations and specifications for the suppliers.
- Economic analysisInvestment, savings, payback time and financial indicators.
- VerificationMeasurement after the works and comparison with the baseline.
What you receive
Images




FAQ
Is the lighting calculation also a fixed-price service?
Yes, for a workplace: you will find it among the proven services, in the Fluids and energy section.
Can you carry out the mandatory energy audit?
The mandatory audit must be signed by a certified professional. We can prepare surveys, measurements and technical analyses and work together with the expert who signs it.
Is the saving promised by the supplier reliable?
It can be verified: with a baseline measured beforehand and a measurement after the works, under the same production conditions.

Measure first, then invest
Tell us about the project: we reply within 24 working hours with the method, the timing and a written quotation.