The work in this sector
In the automotive sector tooling runs thousands of cycles a day: a grip that works loose, a datum that shifts by a few tenths or a guard that is bypassed are paid for in scrap, line stoppages and injuries. That is why the design starts from the cycle, the part and the datums, not from the drawing of the structure.
The studio designs line equipment, handling systems, beams and gripping devices for robots and manipulators, and manual or automatic assembly stations, all to order. Every project reaches the workshop with the 3D model, the drawings, the bill of materials and the calculations needed for CE marking.
What we design
Reference standards
Before designing, the regulatory scope is defined: which standards apply, in which version and with which customer requirements.
Standards are revised fairly often: the first activity in every project is to check which edition applies at the date of the design.
How we work
- Cycle and partCycle time, variants, part datums, tolerances and interfaces with robot, line and operator.
- ConceptTwo or three solutions compared on cost, footprint, cycle time and safety, with the reasons for the choice.
- Design and calculations3D model, structural checks, selection of commercial components and risk analysis.
- DocumentationDrawings, bill of materials, cycle diagram, manual and technical file.
- Start-upSupport during assembly and commissioning, and revision of the drawings as built.
What you receive
Images




FAQ
Do you work to the standards of our end customer?
Yes. Components, suppliers and formats required by the manufacturer are adopted at the start of the project and become part of the design specification.
Can you carry out only the calculation of a gripping device that is already designed?
Yes: the verification of lifting beams, grippers and lifting points is also among the proven services with a fixed price.
Do you also handle the CE marking of the equipment?
We prepare the risk assessment, the calculations, the manual and the technical file. The declaration remains the manufacturer's, who signs it.

From line cycle time to the technical file, in a single project
Tell us about the project: we reply within 24 working hours with the method, the timing and a written quotation.